Metal Roofing Reviews in Raymond, Alberta

4 verified Interlock® Metal Roofing reviews in Raymond, Alberta. Metal roofing in Raymond, AB →

Interlock® metal roofing installations in Raymond, Alberta

Interlock Aluminum Cedar Shingle Metal Roofing – Tudor Brown | Grande Prairie, AB (Front elevation)Interlock Aluminum Cedar Shingle Metal Roofing – Deep Charcoal | Drayton Valley, AB (Front elevation)Interlock Aluminum Slate Metal Roofing – Black | Edmonton, AB (Full roof overview)Interlock Aluminum Slate Metal Roofing – Black | Calgary, AB (Front elevation)Interlock Aluminum Cedar Shingle Metal Roofing – Deep Charcoal | Crossfield, AB (Street view)Interlock Aluminum Slate Metal Roofing – Deep Charcoal | Calgary, AB (Front elevation)

See more Interlock® roof photos in Raymond, Alberta →

Completed Interlock® metal roofs near Raymond, AB

Every marker below is a real, anonymized Interlock® aluminum roof completed by a Certified Interlock Installer. Explore verified installations across Raymond, Alberta, Canada on the interactive project map and photo grid — filter by roof profile (Slate, Cedar Shingle, Shake, Mediterranean Tile and Standing Seam), colour and year of completion.

Showing all 4 reviews

  • ★★★★★

    Metal Shingles Raymond, AB Review 🇨🇦 — October 12, 2015 | Interlock®

    Review: October 12, 2015Completion: September 15, 2015

    I called about one or two things and didn't hear back from them. The people at the office need to do a little better.

  • ★★★★★

    Metal Shingles Raymond, AB Review 🇨🇦 — July 8, 2015 | Interlock®

    Review: July 8, 2015Completion: June 14, 2015

    The first crew did whatever they wanted, and no one checked up on them, it was like they showed up when they had a spare moment, then eventually quit.

  • ★★★★★

    Metal Shingles Raymond, AB Review 🇨🇦 — January 20, 2015 | Interlock®

    Review: January 20, 2015Completion: December 20, 2014

    The clean up could have been improved. I did not realize that they left gobs of black tar between the breezeway that I had to clean up. I did not agree with them having me to sign a paper right after they finished. I didn't get a chance to look at the completed job although I was there the entire time. I felt pressured to sign the paper before they would leave. I feel they should have waited at least a week later before having to sign papers.

  • ★★★★★

    Interlock Metal Roofing Review — Raymond, AB (Installed 2005)

    Review: October 21, 2005Completion: October 23, 2005

    I would like to share some thoughts with regard to our new Interlock roof which has recently been installed: We moved into this house five years ago thinking we would never have to put a roof on the house while we lived here. To our surprise, this past spring, I looked up to check the roof, and what did I see? Shock and horror at curling tiles! I couldn’t believe it; so I had it professionally inspected. Sure enough, I was told to have the roof replaced by next spring! I couldn’t believe my… Read more →